mparrish2965 mparrish2965
  • 03-07-2022
  • Engineering
contestada

A feature control frame must be connected to

Respuesta :

tcs1257621
tcs1257621 tcs1257621
  • 03-07-2022

Answer:

Surface Parallelism When a surface is to be parallel to a datum plane, the feature control frame is connected by a leader to the surface, or to an extension line from the surface.

Explanation:

Answer Link

Otras preguntas

need help with this please
Help please this is khan academy
Why did white Tulsans feel they needed to punish black tulsans in 1921?
Slippery Slopes promised to arrange for a licensed California contractor to "work with" Water Slides Designs on the construction; Slippery Slopes also assured i
In a game of pool, the cue ball moves at a speed of 2 m/s toward the eight ball. When the cue ball hits the eight ball, the cue ball bounces off with a speed of
The function f(x) = –x2 – 4x + 5 is shown on the graph. On a coordinate plane, a parabola opens down. It goes through (negative 5, 0), has a vertex at (negative
Please can someone help me on this I’m trying to revise for my test and I don’t understand this question
Dakota has four yardsticks and two 12-inch rulers.If she lays all four of the yardsticks and both rulers end-to-end,what is the maximum number of feet she can m
pls the explanation of archimedes principle
Which of the following are solutions to the equation below? 4x^2 + 4x + 1 = 9Check all that apply