The first step in a risk management program is to
A. Measure the frequency and severity of potential losses.
B. Monitor the results of the program.
C. Identify the risks and potential losses.
D. Evaluate the alternatives.

Respuesta :

nataliescar nataliescar
  • 03-01-2017
i believe that answer is C
Answer Link

Otras preguntas

5x+4y+100 in slope intercept form
Write a system of equations with a solution (4,–3)
Which of the kingdoms has the smallest number of known species
5x+4y+100 in slope intercept form
An airplane travels 3,260 kilometers in 4 hours. What is the airplane’s average speed?
Write a system of equations with a solution (4,–3)
The length of a diagonal of a cube with edge length 25cm
Which of the following can be considered fossils? a. a 1 billion year-old rock. b. a 1 billion year-old piece of amber. c. a 1 billion year-old piece of amber w
The length of a diagonal of a cube with edge length 25cm
Which of the kingdoms has the smallest number of known species