Victoriacaulder4
Victoriacaulder4 Victoriacaulder4
  • 04-10-2021
  • History
contestada

What are the risks involved in choosing to build within one kilometer of a site such as Teotihuacan?

Respuesta :

zarampa
zarampa zarampa
  • 04-10-2021

Answer:

Explanation:

The risk is the cancellation of construction due to the high possibility of an anthropological find.

Another risk is the protests of people who feel offended by an alleged invasion of an ancestral territory.

Answer Link

Otras preguntas

How is wave amplitude measured in a transverse wave?
Could the thermal energy of a bowl of hot water equal that of a cold water? Explain.
What is the circumference of a circle with a radius of 84 inches? inches (use 3.14 for pi.)
Determine the zeros of the function f(x)= 3x^2-7x 1
can someone help please
What is the circumference of a circle with a radius of 56 ?
What device that converts energy of motion into eletrical energy?
Please answer the both questions which is Grindded response and Short response
The ice sheet on antarctica has uniform depth true or false
Which of the following is not a common reason for a writer to use italics? Im thinking this - To state the correct title of a book, film, or play To indicate