krishnashrrstha41
krishnashrrstha41 krishnashrrstha41
  • 04-08-2021
  • Mathematics
contestada

15men can complete a piece of work in25days. how many men should be added to complete the same work in15days.​

Respuesta :

mhanifa
mhanifa mhanifa
  • 04-08-2021

Answer:

  • 10 men

Step-by-step explanation:

Amount of work done by 15 men is:

  • 15 men *25 day = 15*25 man*days

Same work can be done by 25 men, in 15 days, so 10 more men should be added.

Answer Link
abovejosh
abovejosh abovejosh
  • 04-08-2021
Answer: 10 men explanation: guy above me
Answer Link

Otras preguntas

10 Read this sentence from paragraph 16: "Well, how did you feel when you received the letters?' Ms. Alvarez asked." A Why does Ms. Alvarez ask Emmaline this qu
what does f mean in f(x)=3/2x+2? Also do the two points 0,2 and 2,5 work with the equation?
HELP ME please U-U I'll GIVE BRAINLEST Which of these is NOT a region of Argentina? Patagonia Pampas Paraná Plateau Gran Chaco
Three less than the quotient of a number and four? answer choices: a)3-(x+4)b)3-x/4c)×/4-3 d)4x-3​
Find the area of the shaded regions.​
hiii I don't need the answer but do you know what this is about and may you please explain? thank youuu ​
I NEED HELP WITH MATH
How was production different after the Industrial Revolution than it was before?
Lesson Check (4.NF.8.30) 1. Write a mixed number that is equivalent to 16/3
Find the 4th term in the sequence with the following definition