maaf34nb8f maaf34nb8f
  • 01-04-2021
  • Engineering
contestada

A short framing member that fills the space
between the rough sill and the soleplate is a

Respuesta :

iBear25k
iBear25k iBear25k
  • 01-04-2021

A short framing member that fills the space between the rough sill and the soleplate is a cripple stud.

(HAVE A GOOD DAY!!!)

Answer Link

Otras preguntas

Compare the rate of loss of heat from a metal sphere at 827°C with the rate of loss of heat from the same sphere at 427°C,if the temperature of the surrounding
Tony works as a tutor for $11 an hour and as a waiter for $13 an hour. this month he spent 106 hours at his 2 jobs. let “t” be the number of hours tony worked a
What are the types of cancer?
GIVING 50 POINTS!!! Solve the triangle using the law of sines. Show all work and round answers to the nearest tenth.
Solve the system of equations: Enter the x-coordinate in the FIRST box and the y-coordinate in the SECOND box.
The formula below gives the sum of the degrees, S, of the interior angles of a polygon. If n represents the number of sides, which equation solves for n? S = (n
A compound contains 38.7% K, 13.9% N, and 47.4% O by mass. What is the empirical formula of the compound
I WILL GIVE BRAINLYEST FOR THE ANSWER TO THIS QUESTION PLS​
(NH4)2S is a strong electrolyte. Determine the concentration of each of the individual ions in a 0.300 M (NH4)2S solution.
The kid cooks a meal for himself and the Tramp. What does he make? Sausages and beans. Pancakes. Chicken. Soup.