ps8474272 ps8474272
  • 01-03-2021
  • Mathematics
contestada

if 9 people can do a piece of work in 90 days then how many days 19 people will take to complete the same piece of work​

Respuesta :

rmroomi2
rmroomi2 rmroomi2
  • 01-03-2021

Answer:

190 days

Step-by-step explanation:

cross multiply

19×90=1710

1710/9=190

Answer Link

Otras preguntas

What is the function of meiosis?
What is the correct definition of a motif
The airplane has a wingspan of a feet and a tailspan of b feet. If the tailspan in the drawing is 2 inches, and a/b = 3, what is the actual wingspan of the airp
What did the Supreme Court mean by "separate but equal"? Why did many people think this was faulty
Rob sometimes confuses real and imaginary events. what does he suffer from?
Should people be concerned about world hunger
is zinc oxide a chemical or physical change when heated?
As a car is driven around burning gasoline, what is released into the atmosphere?
provide five benefits from the services you know
Jeb looked through the magazine and found an article called "A Look Back at the Civil War." He wondered if the article had any information on Robert E. Lee. He