dishmanm89 dishmanm89
  • 03-02-2021
  • Business
contestada

how to figure projected overhead

Respuesta :

beautifulcharm
beautifulcharm beautifulcharm
  • 03-02-2021

Answer:

To calculate the overhead rate, divide the total overhead costs of the business in a month by its monthly sales. Multiply this number by 100 to get your overhead rate. For example, say your business had $10,000 in overhead costs in a month and $50,000 in sales.

Answer Link

Otras preguntas

A chemist recorded the change in temperature of a cooling liquid as negative 25.5 Fahrenheit over a 1.5 minute. The temperature fell at a constant rate well was
The current Georgia state constitution went into effect in what year
You serve a volleyball with a mass of 2.1 kg.the ball leaves your hand with a speed of 30 m/s.
how did christianity contribute to the fall of roman empire? A. it caused inflation B. it split the empires apart C. it weakened the emperor D. it attracted th
Please Answer, thank you so much!
What is the reminder in the division problem below?
three research departments have 6, 9, and 10 members respectively each department is to select a delegate and Alternate to represent the department at a confere
How did Common sense turn a largely local Massachusetts protest for redress of specific grievances into an ideological crusade for the idea of Republicanism?
what information does DNA provide to all of the cell's organelles
Natalie bought 8 chicken wings for $10. What was the cost of the wings in wings per dollar?