nmartin7537 nmartin7537
  • 04-01-2021
  • Mathematics
contestada

It takes 5 men 12 days ro complete a job how many days does it take 3 men to complete the job

Respuesta :

eloo59980
eloo59980 eloo59980
  • 04-01-2021

Answer:

5=12

3=? then Criss cross it and you will get 12*3 divided by 5 then you get 7.2

so the answer will be 7 days

Answer Link

Otras preguntas

How are globes and map projections related?
The six different components of the rock cycle include magma, soil, sediments, and a. intrinsic igneous rock, extrinsic igneous rock, metamorphic rock, sediment
Los niños celebran los cumpleaños con _______.
Madame loisel is âfull of a proud, simple joyâ that she has replaced the necklace so perfectly. in what way is her feeling ironic?
evaluate the expression when a= 5 c=-3 -a+4c
Which macromolecule provides a person with most of the energy that is needed for daily activities? a.carbohydrates b.lipids c.nucleic acids d.proteins
Which distribution exhibits a negative skew?
The people from Asia who first migrated to the Americas came here by crossing the: continental divide Pacific Ocean Bering Land Bridge Land Bridge none of thes
is an adult chooses to consume alcohol and then drive, which is the most important rule to follow?
Select the expression that has a quitiont greater than 1. Explain your reasoning. 4 2/3 divided by 5 1/4= 3 1/8 divided by 2 2/5=