how do you find the mean completion time of a PERT network diagram?​

Respuesta :

okekesarah01642112
okekesarah01642112 okekesarah01642112
  • 02-01-2021

Answer:

PERT is an estimating technique that uses a weighted average of three numbers (see below) to come up with a final estimate. The resulting PERT estimate is calculated as (O + 4M + P)/6. This is called a "weighted average" since the most likely estimate is weighted four times as much as the other two values.

Answer Link

Otras preguntas

Which statement is an ineffective claim?
The telegraph was invented by: Elias Howe Samuel Morse Charles Goodyear Cyrus McCormick
Which is the quotient of 11/12 divide 5/7 a.55/84 b.16/19 c.77/84 d.1 17/60?
How do u find the answer
Explain how one of the pilgrims from the prologue represents an issue of medieval society
Is 2.58, 2.6,2 5/8,2 2/3 in order from least to greatest
There are 7 red candies in a pack, 9 blue candies in a pack, and 12 pink candies in a pack. If your wonderful math teacher wants to split the candy for their st
How to solve this it goes in 4 different directions
Johannes Gutenburg's major contribution to culture was A. the printing press B. his works of poetry C. support of Martin Luther’s ideas D. his trans
Which of the following leaders greatly expanded the borders of Russia? A. Ivan the Terrible B. Peter the Great C. Nicholas II D. Alexander the Great