a person can do a job in 6 day days . another can do the same job in 4days . if they work together, how long do they need to finish the job?

Respuesta :

wegnerkolmp2741o
wegnerkolmp2741o wegnerkolmp2741o
  • 01-08-2020

Answer:

It will take them 2 2/5 days working together

Step-by-step explanation:

To find the time worked

1/a + 1/b = 1/t

Where a and b are the times worked individually and t is the time worked together

1/4 + 1/6 = 1/t

Multiply each side by 12t to clear the fractions

12t( 1/4 + 1/6 = 1/t)

3t + 2t =12

Combine like terms

5t = 12

Divide by 5

t = 12/5

t = 2 2/5

It will take them 2 2/5 days working together

Answer Link

Otras preguntas

Score Frequency 1| 0 2| 3 3| 4 4| 16 5| 22 Scores on an AP Exam at a local high school are recorded in the table. What was the average score? A) 0.234 B) 3
Which of the following is not the same as 105.6 milligrams? 0.1056 g 0.0001056 kg 0.001056 dkg
Please help me with this and thank you
how much is a dollar in Mexico
A river flows down towards a lake along an incline. initially the river is 90 m above the lake flowing at a rate of 3 m/s. at the lake the velocity is 0 m/s. yo
A car travels 40km/hr for 2 hours and 55km/hr for 2 hours how far has the car traveled what’s its average velocity?
The hypotenuse of a 45°-45°-90° triangle measures 24 inches. What is the length of the one leg of the triangle? 12 in. in. 24 in. in.
Can someone please help me solve this
Hydrogen-filled balloon was ignited and 1.50 g of hydrogen reacted with 12.0 g of oxygen. how many grams of water vapor formed? (assume that water vapor is the
What would the world be like without internet?