​Finishing the construction of a home two days after the contract called for completion (no injury occurs) most likely will be considered

Respuesta :

andriansp andriansp
  • 08-06-2016
Finishing the construction for a longer period than the date that already agreed upon would be most likely considered : Breach of Contracts.
Which mean that the constructor basically fail to met his end of the contract agreement, causing the other party has the right to walk out from their contract
Answer Link

Otras preguntas

7 special right triangles
what is the difference between a left and right twix
17 tens = how many ones
A group of protesters went on a hunger strike and drastically lowered their caloric intake. It is likely that in response to this semistarvation:
what factors determine if an ecosystem can recover from a natural disaster
What set of integers greater than -6 and less than 3
Select the correct text in the passage. Read this excerpt from an autobiography. Which sentence implies that the author is excited about wearing her cheerleadin
¿Qué fecha es el viernes si hoy es martes, el 29 de diciembre?
A force of 25N is exerted on a surface with an area 5m2 what is the pressure on that area?
What is the definition of rhythm