jreedy4403 jreedy4403
  • 02-08-2019
  • Computers and Technology
contestada

In planning for disaster recovery, what is the ultimate goal?

Respuesta :

bbb99
bbb99 bbb99
  • 04-08-2019
Be able to get the systems fully operational with minimum downtime. That means having parallel backups of data but also systems that can be bored up often at a different location
Answer Link

Otras preguntas

how many moles of hydrogen are in 2.8 moles of caffeine
In 2010, a new type of life form was found in California's Lake Mono. The microbe found has a variation in the structure of its DNA. DNA is known to consist
In what ways did immigrants contribute to American society in the early 1900s
What is the difference between dehydration and overhydration? why does swelling occur with overhydration? what symptoms are similar between these two conditions
find the value of d 2d-5=17
Discuss three ways in which sport can support nation building
What is the 217th digit after the decimal point in the repeating decimal 0.3456
Soil structure and soil texture are essentially the same property of soil. please select the best answer from the choices provided t f
Zach spent 2/3 hour reading on friday and 1 1/3 hours reading on saturday how much more time did he read on saturday than on frifay
That sounds like a good idea, the verb sounds is ____.